Amazon Robotic Sortation Center (ARSC) 18K OB G=0.5 GEN 3.0 V1.4

The ARSC sortation facility in Dekalb, IL, will include a 700,000-square-foot warehouse and distribution center across 58 acres. Set to open in 2023, the structure includes wide-flange columns, HSS columns, beams, stairs and handrails, ramp rails, guardrails, transformer and interior and exterior bollards, roof hatch access ladders, steel plate supports at the downspout, elevator pit ladder, and sump frame framing. IDS used Tekla 2019i software to prepare erection and shop drawings.