The 674-ton industrial pipe rack built for the Kimberly-Clark power plant in Chester, PA, is composed mainly of wide-flange columns, beams, and bracings. This project contained shop-assembled module frames and trusses with unique ID numbers for ease of erection. This project also has dunnage area on existing steel with many field verifications. IDS used Tekla 2017i to prepare erection and shop drawings.